Courtesy the kemlite company.
Minimum pitch corrugated plastic roof.
In most occasions a pitch of three in twelve is preferred but this should also take into consideration the manufacturer s recommendations as well the unique condition of the corrugated metal roof.
It is the recommended slope as there is no guarantee if you opt for flatter pitch than this.
That is why all roofing manufacturers recommend the 5 degree pitch as the minimum slope and they will not provide any guarantees if it is installed flatter than this.
Corrugated metal roofing has the same minimum pitch.
The pitch is measured in inches of vertical rise per foot of horizontal run and the 5v crimp profile shown above requires a minimum slope of three in twelve or 3 12 3 inches vertically per 12 inches horizontally.
Just like other metal roofs the minimum pitch for a corrugated metal roof largely depends on the profile of the roof.
The minimum pitch for a roof is 1 4 12 which translates to 1 4 inch rise to 12 inches of run.
4 attach rafters to header and crossbeam with 1 screws and nails.
Installing translucent plastic corrugated roof panels.
The corrugated metal roof minimum slope is 5 degrees.
Pre notch rafters to compensate for slope.
Allow a 1 minimum pitch per foot for adequate drainage.