Siding and trim that extends down to a roof dormers second floors etc and decks requires a minimum of a 2 inch gap to avoid wicking.
Minimum distance from cedar siding to roofing.
For example a slope of 4 12 means 4 inches of rise for every 12 inches in run.
The reason for requiring a minimum distance from board edges and ends is clear.
Having your siding too close to the ground is just asking for trouble.
How to cut siding near the roof line.
Trim such as water table or skirt boards must be a minimum of 6 inches above the grade.
How i detail the rake.
I run a trim board along the rake keeping this the required distance above the roof surface and bring my siding board down to the trim maintaining a 1 4 inch gap that gets caulked.
Cedar siding should be securely nailed to framing members.
Can i put new cedar shingle siding over my existing cedar shingle siding.
Instead of a standard straight cut you must cut these pieces.
Roof ground clearance.
Homes with gables at different levels on the roofs often have siding that meets the roof line.
I recently inspected a new 4 5 million dollar home for one of my clients and one of the problems i found was the patio was poured too high and is touching the siding ceder shingles.
The closer to the grade the sooner your siding will deteriorate.
The number of board spaces between the soffit and bottom of the lowest piece of siding at the foundation should be such that the overlap is as per the table.
The material can be installed across the minimum 3 of.
Details like this let me stay profitable and allow me.
Wall construction like all siding materials western red cedar performs best when installed properly on a suitable frame.
This article will examine just that question of the recommended distance from ground and siding your clearance is vitally important for the siding s long term protection and safeguard.
I added in my report a note that 2 minimum clearance is required between the siding and the patio surface.
Trim that extends down to a roof such as on dormer sidewalls and decks require a minimum of a 1 to 2 inch gap to avoid moisture wicking into the end grain.
For cedar siding over wood sheathing nailed at studs for application over foam sheathing add the thickness of the foam to the tabulated nail length.
Ground contact areas trim such as water table or skirt boards must be a minimum of 6 inches but better to be 18 above the ground.